Silchester Control Systems - Specialists in Automation and Control

Silchester Control Systems Ltd.

For more information about Silchester, please contact a member of staff.

PLC

corner1.jpg (746 bytes) low.jpg (697 bytes) low7.jpg (742 bytes)
low4.jpg (703 bytes)
line.gif (700 bytes)
images/bullet1.gif (602 bytes) Home
line.gif (700 bytes)
images/bullet1.gif (602 bytes) History
images/line.gif (700 bytes)
bullet1.gif (602 bytes) Consultancy
images/bullet1.gif (602 bytes) PLC
images/bullet1.gif (602 bytes) SCADA
images/bullet1.gif (602 bytes) MES
images/bullet1.gif (602 bytes) Instrumentation
images/bullet1.gif (602 bytes) Installation
images/bullet1.gif (602 bytes) Validation
images/bullet1.gif (602 bytes) Training
images/line.gif (700 bytes)
images/bullet1.gif (602 bytes) ISO9000
images/bullet1.gif (602 bytes) GAMP
images/bullet1.gif (602 bytes) 21CFR pt11
images/line.gif (700 bytes)
images/bullet1.gif (602 bytes) Partnerships
line.gif (700 bytes)
images/bullet1.gif (602 bytes) Projects
images/line.gif (700 bytes)
images/bullet1.gif (602 bytes) Careers
images/line.gif (700 bytes)
images/bullet1.gif (602 bytes) Downloads
images/line.gif (700 bytes)
images/bullet1.gif (602 bytes) Contacts
images/line.gif (700 bytes)

logo_rockwell.gif (5765 bytes)

logo_siemens.gif (2612 bytes)

logo_schneider.gif (2607 bytes)

wpe2.jpg (2129 bytes)

Experience gained by all our engineers has meant we have probably dealt with most types of programmable logic controllers (PLCs), both old and new generations. These include but are not limited to:

 

Allen Bradley
Siemens
Telemecanique
GE Fanuc
MTL
Eurotherm
Mitsubishi
ABB
Omron
Cutler Hammer
 

Using our proven procedures for structured design we produce code in all known formats; ladder logic, function block, instruction list, statement list and graphset whether IEC 1131 or not.

Each new item, or block of code is individually written from the software design specifications, and then tested. In the event of repeated code, we duplicate the tested block as necessary. This reduces software construction times dramatically.

Finally, the completed code is tested at the office for exceptions by a team not involved with the project, reducing the risk of complacency. It is then ready for testing after installation.

We have also used several Soft PLC and DCS systems.

low8.jpg (740 bytes)