Build Validation
Quality and compliance at every stage
We follow rigorous GAMP quality procedures with three key testing stages: Factory Acceptance Test (FAT), Installation Qualification (IQ), and Operational Qualification (OQ). Our flexible system can also adapt to specific customer needs, such as Site Acceptance Testing (SAT).
- FAT: Verifies that the build meets approved standards.
- IQ: Ensures the installation is up to standard.
The Operational Qualification (OQ) is the final stage where we test and commission the system using actual plant operations. Based on user specifications, the OQ ensures every system component meets the required standards before handing over to the client for Process Qualification (PQ).
All documents are traceable to the relevant industry-specific design specifications. Validations and qualifications are crucial in high-integrity industries like Pharmaceuticals, Nuclear, Food/Beverage, and Aerospace.
Silchester boasts a team of skilled validation experts and collaborates with top industry consultants. We handle both retrospective and design-stage validations, leveraging years of experience to exceed your expectations.
Our EC&I Build Validation Services Include:
- Detailed Inspections: Conducting thorough inspections of all electrical, control, and instrumentation components to ensure they meet design specifications.
- Installation Verification: Thorough verification of all installations to ensure compliance with design specifications and regulatory standards.
- Compliance Verification: Ensuring all systems comply with relevant industry standards and regulatory requirements.
- Functional Testing: Performing rigorous functional tests to verify that all systems operate correctly and efficiently.
- Documentation Review: Reviewing all documentation to ensure accuracy and completeness, including design documents, installation records, and test results.
- Performance Validation: Validating the performance of your systems to ensure they meet operational requirements and perform reliably under real-world conditions.
- Issue Resolution: Identifying and addressing any issues or discrepancies found during the validation process to ensure optimal system performance.
- Final Approval: Providing a comprehensive validation report and final approval to confirm that your systems are ready for operation.
At SCS, we are committed to delivering EC&I build validation services that guarantee the quality and reliability of your systems. Partner with us to ensure your industrial control systems are built to the highest standards and ready for optimal performance.
Get In Touch for Expert Electrical Controls & Instrumentation Services
Ready to validate your build?
Contact us today to discuss your EC&I build validation needs. Our team of experts is here to provide tailored solutions that ensure your systems meet all specifications and regulatory standards. Let’s work together to achieve seamless build validation and drive your success.
Get in touch now!





















